VIDEOMAN Futuro 7.1 Especificaciones Pagina 10

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 12
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 9
Cable requirement - STAR Wiring method
FUTURO-7.1M
MONITOR
4core
Screened
Fig8
FUTURO-7.1C
CAMERA
Fig8
Fig8
Power Supply
FUTURO-7PS
Power Supply
for door latch
Junction room
4core
Screened
An additional power supply and
Fig8 Cable is required for door
strike operation (Indicated as
broken lines on the diagrams)
Fig8
Fig8
Fig8
Fig8
FUTURO-7.1M
MONITOR
FUTURO-7.1C
CAMERA
FUTURO-7.1 M
MONITOR
Power Supply
FUTURO-7PS
Power Supply
for door latch
Junction room
4core
Screened
5core
Screened
5core
Screened
Cable requirement
Based on the distance from a camera to
the furthest monitor,
< 20M : CAT5 cable
A (Audio)
G (GND)
V (Video)
G (GND)
B (12VDC)
B (12VDC)
double up
DO 1
DO 2
(door open)
Orange
W/Orange
Green
W/Green
Blue
W/Blue
Brown
W/Brown
Fig8
Fig8
Fig8
Fail-Secure
Door Strike
FUTURO-7.1C
CAMERA
Fig8
Fig8
FUTURO-7.1M
MONITOR
FUTURO-7.1M
MONITOR
Power Supply
for door latch
Power Supply
FUTURO-7PS
Multi Camera Switcher
FUTURO-7.1SW
Fig8
Junction room
4core
Screened
6core
Screened
6core
Screened
CAT5 wire configuration
< 50M :
14/020 (0.44mm
2
) shielded cable
(connect shield to G)
AND
RG-59/U for video signal
(connect core to V & shield to G)
< 100M :
NOTE
Fig 8 : 2Core 24/020 ( = 2Core 0.75mm
2
)
Junction room
24/020 (0.44mm
2
) shielded cable
(connect shield to G)
AND
RG-59/U for video signal
(connect core to V & shield to G)
> 100M :Contact your supplier
Page9
Fig.18
Fig.19
Fig.20
:Electrical switch room, junction room
or ceiling where all wires are joined.
Vista de pagina 9
1 2 ... 5 6 7 8 9 10 11 12

Comentarios a estos manuales

Sin comentarios